Tesco staff restaurants
In 2016 Tesco updated the staff restaurants at their Hertfordshire Head Office site: a rolling program implemented across 4 restaurants and 6 cafes serving 4,500 staff.
Working freelance for the joinery contractor; 360deg carried out site surveys & liaised with the client, coordinated with other contractors, produced workshop drawings and oversaw installation. The key design challenges here were that the design should enable rapid and efficient installation, all finishes should be highly durable & resistant to aggressive cleaning.
Front-of-house worktops were in Krion for its anti-bacterial and heat resistant properties, all sub-frames and back-of-house worktops in catering grade stainless steel, and vertical panels in either timber effect laminate or ceramic tiling.